Process Heaters - Sorted by Tube Area
| Inventory Number |
Manufactured By |
Year Manufactured |
Type |
Duty |
TubeArea |
Tube Des. Press. (PSI) |
| PH-124 |
|
|
Direct Fired Cabinet |
|
|
|
| PH-023 |
Thermo Flux |
1994 |
Direct Fired Cabinet |
20 MM BTU/HR |
|
150 PSI |
| PH-100 |
Evco |
1995 |
Gycol Reboiler |
750 BTU |
|
15 |
| PH-120 |
Russell Engineering Corp. |
1971 |
Direct Fired Cabinet |
1.4mmbtu |
|
75 |
| PH-00 |
|
|
|
|
|
|
| PH-046 |
Rama Fab. |
3/7/00 |
Glycol Reboiler |
2 MMBTU/HR |
|
|
| PH-017 |
Nebraska |
1980 |
Boiler (Water Tube) |
150,000 BTU/HR |
|
650 |
| PH-127 |
FCI |
1993 |
Direct Fired Cabinet |
Thermal Reactor |
|
15 |
| PH-128 |
Proquip |
|
Direct Fired Cabinet |
Reactor Furnace |
|
14 |
| PH-016 |
SIVALLS |
1971 |
Direct Fired RECLAIMER |
350,000 BTU/HR |
|
|
| PH-012 |
G. C. Broach Company |
|
Direct Fired Cabinet |
8.25 MMBTU/HR |
|
|
| PH-038 |
TH Russel |
none |
Heater |
600 M BTU |
|
|
| PH-035 |
NATCO |
1985 |
|
175mbtu/hr |
|
|
| PH-083 |
Wheco |
1967 |
Direct Fired Cabinet |
37.500 mm/btu / hr |
---?--- |
250 |
| PH-077 |
Econo- Thermo |
---?--- |
Direct Fired Cabinet |
10.615 mm/btu/hrs |
---?--- |
150 |
| PH-062 |
Cleaver Brooks |
1984 |
Direct Fired Cabinet |
Input 25106000 BTU |
---?--- |
150 |
| PH-070 |
Maloney Crawford |
1966 |
Direct Fired Cabinet |
4,000,000 MM BTU Regin |
---?--- |
Atmos |
| PH-072 |
BS & B |
1970 |
Uniflux Heater |
19.6 MM BTU HR. |
---?--- |
1050 |
| PH-073 |
BS & B |
1971 |
Uniflux Heater |
19.6 MM BTU |
---?--- |
1050 |
| PH-061 |
Cleaver Brooks |
1980 |
Direct Fired Cabinet |
input 25106000 BTU |
---?--- |
150 |
| PH-084 |
Wheco |
---?--- |
Waste Heat |
10.615 mm/ btu/ hr |
---?--- |
250 |
| PH-092 |
Mcgill |
1983 |
tail gas incinerator |
---?--- |
---?--- |
---?--- |
| PH-074 |
BS & B |
1968 |
Uniflux Heater |
19.6 MM BTU |
---?--- |
1050 |
| PH-095 |
Sivalls |
1979 |
Direct Fire |
|
100 for 1 Firetube |
50 |
| PH-130 |
Abbco |
1991 |
Direct Fired Cabinet |
3612 LB/HR Steam |
1096sqft |
525 |
| PH-122 |
Loveco Inc. |
1982 |
Stabilizer Reboiler |
2,993 mm BTU hr |
1114 sq ft |
140 |
| PH-129 |
Continental Fabrication |
1993 |
Direct Fired Cabinet |
Waste Heater Boiler |
1195sqft |
650 shell 15 psi |
| PH-009 |
Econo-Therm |
1971 |
Direct Fired Cabinet |
67,000,000 BT/HR 67.6 |
12,264 SQ.FT. |
150 |
| PH-027 |
BS&B |
1968 |
Direct Fired Cabinet |
5MMBTU/HR |
1300 |
Shell 5PSI Coils 250 PSI |
| PH-093 |
ABCO Industries |
1983 |
Indirect Fired Bath |
2216 surface square feet |
14,828 steam capacity |
150 |
| PH-053 |
E. Keeler Co. |
1982 |
Boiler (Water Tube) |
LBS. Steam/hr 30,000 |
2,595 SQ FT Plus Economizer |
475 |
| PH-052 |
Keeler |
1982 |
Boiler (Water Tube) |
LBS. Steam/hr 30,000 |
2,595 SQ FT Plus Economizer |
475 |
| PH-126 |
Kentube |
1982 |
Direct Fired Cabinet |
2.63mm btu/hr |
2273 sq.ft. |
525 |
| PH-125 |
Kentube |
1982 |
Direct Fired Cabinet |
2.63mm btu/hr |
2273sq.ft. |
525 |
| PH-004 |
C-E Natco |
7-1980 |
Indirect Fired Bath |
2,000,000 |
242.6 SQ. FT. |
12,000 |
| PH-132 |
G.C. Broach Co. |
|
Direct Fired Cabinet |
Furnace |
26- 6" XH tubes x 47'approx. |
1360 Header 1360 |
| PH-133 |
G.C. Broach |
|
Direct Fired Cabinet |
Furnace |
30-6"XH tubes x45'approx. |
1360 Header 1360 |
| PH-115 |
Markle |
1980 |
Waste Heat Boiler |
575 square feet |
4688 # / HR |
15 |
| PH-114 |
Markle MGF. CO. |
1980 |
Waste Heater Boiler |
775 square feet |
4688 # / HR |
200 |
| PH-028 |
Thermo Flux (Jenco Inco) |
1980 |
Direct Fired Cabinet |
20 MMBTU/HR |
480 BARE |
100 psig |
| PH-131 |
Abbco |
1990 |
Direct Fired Cabinet |
3318LB/HR Steam |
658sqft |
100 |
| PH-002 |
Wickes boiler |
1966 |
Boiler (Water Tube) |
25,000 lbs/hr. |
HS 2766 SQ FT |
300 PSI |
|